PENTICTON CREEK REACH 3A LOWER
Reach 3A lower is located immediately downstream of the Nanaimo Ave Bridge. The project involved reconstruction of approximately 80m of creek by removing the concrete lining, widening the channel, placing large riprap to provide bank protection and placing large river cobble to create three riffle-pool sequences. To undertake the project, it was necessary to dewater the channel and relocate all fish.
PROJECT ADVANCEMENTS:
- Fish migration
- Creation of fish resting and rearing areas
- Spawning bed at the riffles
- Creation of a back eddy/gravel retention area
- Incorporation of instream woody debris
- Channel of natural materials vs. concrete
- Addressing the failing concrete lining