PENTICTON CREEK REACH 12A
The Reach 12A project included liaising with the client and Restoration Committee regarding priority projects due to unexpected concrete lining damage caused by a high freshet flow event. Three large drop structures were heavily impacted within the Reach of approximately 200m long by 30m wide.
PROJECT SIZE: $1,300,000
TASKS INCLUDED:
- Site surveys, design drawing preparation, submission for regulatory approvals, and coordinating with environmental and archaeological consultants
- Construction layout surveys
- Construction direction
- Project management and follow-up monitoring